Business solutions for environment and pollution,
so we may have a future to plan for...

QUICK LINKS

Environment Clearance of Projects

Projects that have the potential of causing harm to our environment or eating into our precious natural resources have been identified and categorised by the MoEF (EIA Notification dated September 14, 2006). All such projects are required to get Environmental Clearance before initiating any developmental activity, other than land acquisition. Environmental Clearance is granted on the basis of an EIA (Environmental Impact Assessment) study. The EIA study is a multi-disciplinary technical study of the possible impacts of a proposed project activities on the existing environment and mitigation measures proposed.


Projects Undertaken

 
Environmental Clearance of Coal based Thermal Power Plant (250 MW) at Dibiyapur, Distt. Auriya, for M/s Unitech Machines Ltd. Consultancy included Environmental Impact Assessment Study and preparation of Environment Management Plan (EMP).,

 
Environmental Clearance of Sub City Centre at Nishatganj, Lucknow, for M/s Prayas Buildcon Pvt. Ltd. Consultancy included Environmental Impact Assessment Study and preparation of Environment Management Plan (EMP).
 
Environmental Clearance of Integrated Township at Ghaziabad, for M/s Opus Buildtech Pvt. Ltd. Consultancy included Environmental Impact Assessment Study and preparation of Environment Management Plan (EMP).
 
Environmental Clearance of Expansion of Rama Shyma Paper Mills Ltd, Bareilly. Consultancy included Environmental Impact Assessment Study and preparation of Environment Management Plan (EMP).
 
Environmental Impact Assessment Study and preparation of Environment Management Plan (EMP) for Integrated Industrial Cum Residential Complex (IICRC), Jainpur, Distt. Kanpur Dehat for Uttar Pradesh State Industrial Development Corporation (UPSIDC), Kanpur
 
Environmental Impact Assessment Study and preparation of Environment Management Plan (EMP) for Industrial Area, Banthar, Distt. Unnao for Uttar Pradesh State Industrial Development Corporation (UPSIDC), Kanpur.
 
Environmental Impact Assessment Study and preparation of Environment Management Plan (EMP) for Integrated Township at Lucknow, for M/s Emaar MGF Land Ltd.
 
Environmental Impact Assessment Study and preparation of Environment Management Plan (EMP) for Integrated Township at Ghaziabad, for M/s Emaar MGF Land Ltd.
 
Documentation for obtaining Environmental Clearance of Bagasse based Co-Generation Power Plant at Baheri, for M/s Kesar Enterprises Ltd.
 
Environmental Impact Assessment Study and preparation of Environment Management Plan (EMP) for capacity expansion of Rahman Tannery Ltd, Unnao.
 
Environmental Impact Assessment Study and preparation of Environment Management Plan (EMP) for capacity expansion of Lords Dstillery Ltd, Ghazipur